October 2019
Starts 2nd Shift- Welding
KDA has put in place all the support and infrastructure to start a second shift certified welding operation. This enables KDA to provide over 20 hrs per day of continuous welding capacity for critical path projects.
August 2019
KDA Transit Delivers Oversize/Overweight Load
KDA Transit has the ability and knowhow to safely load and transport oversized/overweight loads. The ability to pickup and delivery is oversized/overweight products provides an extra convenience to KDA’s customers.
July 2019
ESAB Plasma/Oxyfuel Burn Table with plate inventory
KDA has installed an ESAB Plasma/Oxyfuel Burn Table. The ESAB plasma table has a 300 amp Thermal Dynamics Ultra-Cut 300XT Plasma Cutting system with Thermal Dynamics iHC XT plasma height control. The high capacity Oxyfuel side has the ability to cut 12 inch thick material. The Plasma/Oxyfuel Burn Table combined with the plate inventory KDA maintains provides KDA with quick turn around when required.
May 2019
O-M – Vertical Boring Mill
KDA releases to production an O-M – Vertical Boring Mill. In accordance to KDA’s ISO procedure, Equipment Validation, the O-M can now be used to manufacture customer components. The O-M can turn a part that is 23 feet in diameter and weighs over 65 tons. All the critical precision surfaces have been recondition and there accuracies are excellent.
April 2019
KDA Manufacturing Expands Assembly and Project Management Capabilities
KDA expands assembly capabilities to include sandblast/paint, electrical wiring, hydraulic and pneumatic piping, and load/balance testing. Added these capabilities, to existing KDA’s 100 ton lifting, 35ft under hook assembly bay provide a true turnkey assembly operations. KDA’s “everything under one roof”, approach, ensure that KDA can manufacture for less, while retaining complete control over production and quality. KDA Expands Project Management to Include 24 hour drafting capacity. From drawings and engineering to quality checks, we can roll, cut, mill, weld, and everything in-between to deliver the exact equipment as the project requires.
February 2019
Starts 2nd Shift- Machining
KDA has put in place all the support and infrastructure to start a second shift machining operation. This enables KDA to provide over 20 hrs per day of continuous machine capacity for critical path projects.